Bromfords School

Five year Development plan
for
Bromfords School
Grange Avenue
Wickford
Essex

Bromfords School is a popular six form entry secondary school with increasing rolls and an expanding 6th form in Wickford, Essex. The Bryant Harvey Partnership was selected by limited competition and commissioned to analyse the schools existing accommodation in relation to its curriculum needs and prepare a development plan for expansion, remodelling, repair and maintenance.

The existing school buildings were built in two phases circa 1960, and are mainly single storey steel frame structures with curtain walls and flat roofs. They are arranged as a series of inter-connecting blocks around internal courtyards.

The development plan proposed a number of new build, remodelling and fabric repair projects to be carried out over a five year period.

1.   Main Building Fabric Repairs
2.   New Music Suite
3.   Remodel Kitchen and Dining
4.   New IT Suites
5.   New 6th form centre
6.   Remodel Science Laboratories
7.   New Art and Technology
8.   New Food Technology
9.   New Performing Arts (Feasibility Study)
10.   External Works

Back